济南工程板房地基的硬度要求:甲方在浇注基础前,要事先测量好地基的硬度,如有地形特殊或地基硬度相差太大,必须作特殊处理,以确保板房能顺利安装和保证安装后的质量,如何特殊处理,与技术部沟通。
The hardness requirements of the slab house foundation of Jinan project: before pouring the foundation, Party A should measure the hardness of the foundation in advance. If there is special terrain or the foundation hardness difference is too large, special treatment must be made to ensure the smooth installation of the board house and ensure the quality after installation. How to deal with the special treatment should be communicated with the technical department.
济南工程板房
Jinan Engineering Plank house
1、工程板房基础的水平:在基础浇注时一定要先测量好水平,基础浇注完成后,水平误差控制在10mm以内。在与甲方交待时或基础完工后,要求甲方保证基础水平面在误差范围内,否则,影响板房的安装或安装后的质量,甲方自负。
1. The level of Engineering Plank house foundation: the level must be measured before the foundation pouring. After the foundation pouring is completed, the horizontal error shall be controlled within 10 mm. Party A is required to ensure that the horizontal plane of the foundation is within the error range when it is explained to Party A or after the foundation is completed, otherwise, the installation of the board house or the quality after installation will be affected, and Party A shall be responsible for it.
2、混凝土标号:本公司标准板房基础为C20。一般情况下内无钢筋,如有地形、地基特殊或板房特殊,以技术部出图为准。
 
2. Concrete mark: the company's standard slab house foundation is C20. Generally, there is no reinforcement inside. If there is special terrain, foundation or slab house, the drawing of technology department shall prevail.
3、工程板房基础浇注时间:板房的基础浇注应与常规的混凝土浇注工艺一样,不可减少工艺程序。在基础浇注完成到板房安装之间应留有充分的时间,以确保混凝土达到规定的硬度。
3. Pouring time of the foundation of the Engineering Plank house: the foundation pouring of the board house should be the same as the conventional concrete pouring process, and the process procedure cannot be reduced. Sufficient time should be left between the completion of foundation pouring and the installation of slab house to ensure that the concrete reaches the specified hardness.
4、工程板房地基要求:为保证安装工期、安装质量和安装后整洁美观,我公司要求甲方在制作基础的同时,把室内地面也一并浇注完成,水平高度与基础一样,甲方在板房安装完成后,再在室内铺地板既方便,又整洁,也不会影响板房的质量和外观。
4. Requirements for the foundation of Engineering Plank house: in order to ensure the installation period, installation quality and neatness and beauty after installation, our company requires Party A to complete the indoor floor at the same time of making the foundation, and the horizontal height is the same as that of the foundation. After the installation of the board house, Party A will lay the floor indoors, which is convenient and tidy, and will not affect the quality and appearance of the board house.
室内地板的水平高度应比基础水平高度高出50㎜。以确保雨水不会流入室内和地圈梁的牢固程度!
The horizontal height of the indoor floor shall be 50 mm higher than that of the foundation. To ensure that rainwater will not flow into the room and the firmness of the ground ring beam!