彩钢板房拆除之前的基本构思

来源:http://www.lxcaigang.com 日期:2022-11-07 发布人:
彩钢板活动房作为一种拆装都十分快捷便利的建筑物。不仅实用性非常强大,更加具备了。下面我们就来说说济南彩钢板房拆除之前的基本构思吧。
Color steel plate activity room is a very fast and convenient building for disassembly and assembly. It is not only very practical, but also environmentally friendly and energy-saving. Now let's talk about the basic idea before the demolition of Jinan color steel plank house.
拆除前的准备工作:检查脚手架的扣件连接、连墙件、支撑体系是否符合构造要求;根据检查结果补充完善施工方案中的拆除顺序和措施,经主管部门批准后实施;由工程施工负责人进行拆除技术交底;脚手架上杂物及地面障碍物。
Preparations before demolition: comprehensively check whether the fastener connection, wall connecting parts and support system of the scaffold meet the structural requirements; The demolition sequence and measures in the construction scheme shall be supplemented and improved according to the inspection results, and shall be implemented after being approved by the competent department; The person in charge of project construction shall carry out the technical disclosure of demolition safety; Remove the sundries and ground obstacles on the scaffold.
拆除时应做到:拆除作业须由上而下逐层进行,严禁上下同时作业;连墙件须随脚手架逐层拆除,严禁先将连墙件整层或数层拆除后再拆脚手架,分段拆除高差不应大于2步。
During the demolition, it shall be ensured that: the demolition work shall be carried out layer by layer from top to bottom, and simultaneous operation from top to bottom is strictly prohibited; The wall connecting pieces must be removed layer by layer along with the scaffold. It is strictly forbidden to remove the whole layer or several layers of wall connecting pieces before removing the scaffold. The height difference of subsection removal shall not be greater than 2 steps.
如大于2步应增设连墙件加固;当脚手架拆下部后一根长立杆的高度时,应先在适当位置搭设临时抛撑加固后,再拆除连墙件;当脚手架分段、分立面拆除时,对不拆除的脚手架两端,应按照规范要求设置连墙件和横向斜撑加固;各构配件严禁抛掷地面。
If it is more than 2 steps, it shall be strengthened by adding connecting pieces to the wall; When the scaffold is dismantled to the height of the next long vertical pole at the lower part, the temporary bracing shall be erected at the appropriate position for reinforcement, and then the fasteners to the wall shall be dismantled; When the scaffold is dismantled by sections and sections, the two ends of the scaffold that will not be dismantled shall be reinforced by wall connecting pieces and transverse diagonal braces according to the specification requirements; All components and fittings shall not be thrown to the ground.
济南彩钢板房
以下是彩钢板房拆除方法:
The following is the demolition method of color steel plate house:
1.拆除工作开始前,应将电线、天然气管道等通往被拆除建筑物的支线切断或迁移。
1. Before the demolition, the branch lines leading to the demolished buildings such as electric wires and natural gas pipelines shall be cut off or relocated.
2.拆除建筑物前,应在周围设栏杆,禁止其他人员入内。
2. Before the demolition of buildings, safety railings shall be set around to prevent other people from entering.
3.拆除建筑物,应遵守拆除方案,自上而下进行,禁止数层同时拆除。拆除作业人员,应站在脚手架或稳固的结构上操作,拆除某部分时,要防止其他部分发生坍塌,拆除梁、柱前应先拆除其承重的全部结构后进行。
3. Demolition of buildings shall be carried out from top to bottom in accordance with the demolition plan. It is prohibited to demolish several floors at the same time. Demolition operators shall stand on scaffolds or stable structures. When removing a part, other parts shall be prevented from collapsing. Before removing beams and columns, all the structures bearing the load shall be removed first.
4.拆除前应将有倒塌危险的结构物,用支柱等临时加固。
4. Before demolition, the structures with danger of collapse shall be temporarily reinforced with pillars.
5.拆除建筑物时,楼板上不准多人聚集和集中堆放材料,拆除较大或较重的材料。
5. When demolishing buildings, it is not allowed to gather more people and stack materials in a centralized manner on the floor. Large or heavy materials shall be demolished.
按正确的顺序全部拆除后,把所有彩板房材料清理出工地,重建的活动房材料须重新进场,且须经过层层验收和把关后方可使用。更多相关事项就来我们网站http://www.lxcaigang.com进行咨询吧!
After all the materials of the color board room are removed in the correct order, all the materials of the color board room shall be removed from the construction site, and the materials of the rebuilt movable room must be re mobilized, and can only be used after being checked and accepted layer by layer. Come to our website for more information http://www.lxcaigang.com Consult!