二层工程板房搭建需注意这九点事项

来源:http://www.lxcaigang.com 日期:2022-12-26 发布人:
二层工程板房搭设的时候不能马虎。疏忽会产生一些隐患。为了避免这些问题的出现,我们需要认真准确的阅读板房搭设准则,注意防范,避免一些问题的出现。济南工程板房厂家下面就来讲解几点事项。
The second floor plank house should not be erected carelessly. Negligence may cause some hidden dangers. In order to avoid the occurrence of these problems, we need to carefully and accurately read the rules for building plank houses, pay attention to prevention, and avoid some problems. Jinan project plank house manufacturer will explain a few matters below.
1、工程板房加固人员需要经过现行标准《特种作业人员技术考核管理规则》(GB5036)考核合格的专门的架子工。上岗人员要定期体检,合格者才可以带证件上岗。
1. The reinforcement personnel of the project plank house shall be the special scaffolders who have passed the assessment of the current national standard Management Rules for Safety Technology Assessment of Special Operation Personnel (GB5036). Personnel on duty shall be subject to regular physical examination, and only those who are qualified can take the post with certificates.
2、搭设人员需要佩戴帽、带,穿防滑鞋,按施工操作规程要求进行作业。
2. Erectors need to wear safety helmets, safety belts and anti-skid shoes, and work in accordance with the requirements of safe construction operation procedures.
3.严禁在加固架上悬挂起重设备。
3. It is forbidden to hang lifting equipment on the reinforcement frame.
4、当六级及其以上大风和雾、雨、雪天气,应停止架体搭设和拆除作业。雨雪过后需要采取防滑措施进行作业。
4. The erection and removal of scaffold shall be stopped in case of strong wind of force 6 or above, fog, rain and snow. After rain and snow, anti-skid measures shall be taken for operation.
5、济南二层工程板房架体检查和维护,按规范规定进行。
5. The safety inspection and maintenance of the plank house frame of Jinan second floor project shall be carried out according to the specifications.
济南工程板房
6、钢筋设施工作完成后,施工队伍需要进行自检(填写自检质量记录),合格后,请上级主管部门进行质量验收,专职验收合格后,方可投入使用。
6. After the completion of the reinforcement facilities, the construction team needs to conduct self inspection (fill in the self inspection quality record). If it is qualified, the construction team should ask the superior competent department for quality acceptance. Only after the full-time acceptance is qualified, can it be put into use.
7、搭拆加固架体时,地面需要设置围栏和警戒标志,并派专人看护。
7. When erecting and dismantling the reinforcement frame, the ground shall be provided with fences and warning signs, and special personnel shall be assigned to watch over them.
9、加固架体搭设施工过程,需要及时作好“落手清”工作,保证施工场地文明、整洁。
9. During the erection of the reinforcement frame, it is necessary to do a good job of "hand cleaning" in time to ensure that the construction site is civilized and clean.
以上就是关于济南二层工程板房搭建需要注意的事项知识详解,希望这篇文章能够对大家有所帮助。更多相关内容就来我们网站http://www.lxcaigang.com进行咨询!
The above is a detailed explanation of the matters needing attention in the construction of the second floor plank house in Jinan. I hope this article can help you. More relevant content will come to our website http://www.lxcaigang.com Consult!