在禹城,无论是临时施工营地的搭建,还是工业仓储用房的建设,钢结构板房凭借其便捷、的特点备受青睐。但许多人好奇,一座钢结构板房从 “无” 到 “有”,究竟要经历怎样的过程?生产周期又受哪些因素影响?这背后的时间密码,藏在设计、材料、工艺等多个环节之中。
In Yucheng, whether it is the construction of temporary construction camps or industrial storage buildings, steel structure panel houses are highly favored for their convenience and efficiency. But many people are curious about the process that a steel structure slab house goes through from 'nothing' to 'something'? What factors affect the production cycle? The time code behind this is hidden in multiple aspects such as design, materials, and craftsmanship.
设计环节:精准规划是基础
Design phase: Precise planning is the foundation
钢结构板房的生产,始于设计方案的敲定。设计团队需要根据使用需求、场地条件和建筑规范,确定板房的尺寸、布局、结构形式等。若用于居住,需规划好卧室、厨房、卫生间的空间;若作为仓储,则要考虑货物承载和进出通道。在禹城,设计师还需结合当地的气候特点,如冬季寒冷、夏季多雨的环境,优化保温、排水等设计。简单的标准板房设计,通常 3 - 5 天即可完成;而复杂的定制化设计,如异形结构、特殊功能需求的板房,可能需要 7 - 10 天甚更久,因为设计过程中可能涉及多轮修改和确认,确保方案既满足使用要求,又符合生产可行性。
The production of steel structure panel houses begins with the finalization of the design plan. The design team needs to determine the size, layout, structural form, etc. of the prefabricated houses based on usage requirements, site conditions, and building specifications. If used for residential purposes, it is necessary to plan the space for bedrooms, kitchens, and bathrooms; If used as a warehouse, consideration should be given to cargo carrying capacity and access channels. In Yucheng, designers also need to consider the local climate characteristics, such as cold winters and rainy summers, to optimize insulation, drainage, and other designs. Simple standard board house design can usually be completed in 3-5 days; However, complex customized designs, such as irregularly shaped structures and prefabricated houses with special functional requirements, may take 7-10 days or even longer, as the design process may involve multiple rounds of modifications and confirmations to ensure that the solution meets both usage requirements and production feasibility.
原料采购:供应链的 “时间赛跑”
Raw material procurement: the 'race of time' in the supply chain
设计方案确定后,原料采购随即展开。钢结构板房的主要材料包括钢材、彩钢板、螺栓、连接件等。钢材的采购时间取决于市场供应情况和规格要求,普通常用型号的钢材,若本地市场有现货,1 - 2 天即可采购到位;若需定制特殊规格或进口钢材,采购周期可能延长 7 - 15 天。彩钢板的颜色、厚度、涂层类型多样,若选择常规款式,3 - 5 天可完成采购;若为特殊颜色或特殊涂层工艺的彩钢板,生产周期可能增加 5 - 10 天。此外,原料运输时间也需考虑,从外地采购的材料,根据距离远近,运输耗时在 1 - 5 天不等。若遇到原料供应商产能不足、物流高峰期等情况,采购周期还会进一步拉长。
After the design scheme is determined, raw material procurement will immediately commence. The main materials for steel structure panel houses include steel, color steel plates, bolts, connectors, etc. The procurement time of steel depends on the market supply situation and specification requirements. For common types of steel, if there is stock in the local market, it can be purchased in 1-2 days; If special specifications or imported steel are required for customization, the procurement cycle may be extended to 7-15 days. Color steel plates come in a variety of colors, thicknesses, and coating types. If you choose a regular style, the purchase can be completed within 3-5 days; If it is a color steel plate with special colors or special coating processes, the production cycle may be increased by 5-10 days. In addition, the transportation time of raw materials also needs to be considered. For materials purchased from other places, the transportation time varies from 1-5 days depending on the distance. If there are situations such as insufficient production capacity of raw material suppliers or peak logistics periods, the procurement cycle will be further extended.
加工制作:精细工艺耗时长
Processing and production: Fine craftsmanship takes a long time
原料到位后,进入加工制作阶段,这是钢结构板房生产的核心环节。钢材需要经过切割、焊接、除锈、涂装等多道工序。切割和焊接要保证尺寸精度和结构强度,大型钢结构部件的焊接,可能需要 3 - 5 天才能完成;除锈和涂装为钢材提供防腐保护,一般涂装需经过底漆、中间漆、面漆多层喷涂,每一层干燥时间根据天气和涂料类型不同,可能需要 1 - 3 天,整个涂装过程可能耗时 5 - 10 天。彩钢板的加工相对简单,主要是根据设计尺寸进行裁剪、折边,常规规格的彩钢板加工,1 - 3 天可完成;若涉及复杂造型或特殊工艺,如弧形彩钢板、压花处理等,加工时间会增加 2 - 5 天。此外,各类连接件、门窗等配件的制作,也需要 3 - 7 天不等,整个加工制作阶段,一般需要 15 - 30 天,复杂项目甚更长。
After the raw materials are in place, it enters the processing and manufacturing stage, which is the core link of steel structure panel house production. Steel needs to go through multiple processes such as cutting, welding, rust removal, and coating. Cutting and welding must ensure dimensional accuracy and structural strength. Welding of large steel structural components may take 3-5 days to complete; Rust removal and painting provide anti-corrosion protection for steel. Generally, painting requires multiple layers of primer, intermediate coat, and topcoat spraying. The drying time for each layer may vary depending on the weather and the type of coating, and the entire painting process may take 5-10 days. The processing of color steel plates is relatively simple, mainly by cutting and folding according to the design dimensions. Processing of color steel plates of conventional specifications can be completed in 1-3 days; If complex shapes or special processes are involved, such as curved color steel plates, embossing treatment, etc., the processing time will increase by 2-5 days. In addition, the production of various connectors, doors and windows, and other accessories also takes 3-7 days. The entire processing and manufacturing stage generally takes 15-30 days, and even longer for complex projects.
现场安装:协作提速度
On site installation: efficient collaboration to improve speed
加工好的部件运输到现场后,开始安装工作。安装速度受板房规模、施工队伍经验和天气条件影响。小型标准板房,如 100 以内,经验丰富的施工团队 3 - 5 天即可完成安装;中型板房(100 - 500 )安装周期约 7 - 10 天;大型板房(500 以上)则需要 10 - 15 天。在安装过程中,基础施工是前提,平整坚固的基础能为板房提供稳定支撑,基础施工一般需要 3 - 5 天。若遇到恶劣天气,如禹城夏季的暴雨、冬季的严寒,会影响施工进度,导致安装时间延长 2 - 5 天。此外,安装过程中的细节处理,如门窗密封、防水处理等,也需要时间精细操作,确保板房质量。
After the processed components are transported to the site, installation work begins. The installation speed is affected by the size of the prefabricated house, the experience of the construction team, and weather conditions. Small standard panel houses, such as those within 100 square meters, can be installed in 3-5 days by an experienced construction team; The installation period for medium-sized prefabricated houses (100-500 square meters) is about 7-10 days; Large board houses (over 500 square meters) require 10-15 days. During the installation process, foundation construction is a prerequisite. A flat and sturdy foundation can provide stable support for the prefabricated house, and foundation construction generally takes 3-5 days. In case of severe weather, such as rainstorm in summer and severe cold in winter in Yucheng, the construction progress will be affected and the installation time will be prolonged by 2-5 days. In addition, the detailed processing during the installation process, such as door and window sealing, waterproof treatment, etc., also requires time for meticulous operation to ensure the quality of the prefabricated house.
验收与交付:细节把控保质量
Acceptance and Delivery: Detail Control to Ensure Quality
安装完成后,需进行验收,检查钢结构的稳定性、彩钢板的密封性、水电系统的性等。若发现问题,需及时整改,整改时间根据问题大小,可能需要 1 - 5 天。验收合格后,才能正式交付使用。从设计到交付,一座普通钢结构板房的生产周期通常在 30 - 60 天左右;定制化、大型复杂的板房,生产周期可能长达 60 - 90 天甚更久。
After installation, a comprehensive acceptance inspection is required to check the stability of the steel structure, the sealing of the color steel plate, and the safety of the water and electricity system. If any problems are found, they need to be rectified in a timely manner. The rectification time may take 1-5 days depending on the size of the problem. Only after passing the acceptance inspection can it be officially delivered for use. The production cycle of an ordinary steel structure panel house from design to delivery is usually around 30-60 days; Customized, large and complex prefabricated houses may have a production cycle of 60-90 days or even longer.